. This large-scale mountain restoration power station project, installed capacity of 12 MW, annual power generation of 2500 million kWh. Cadmium telluride power generation glass dosage 5.5 million sheets. The use of power generation glass to restore the exposed surface, play a role in condensing dew, nourish the land, restore the ecological environment and carbon emission goals, and under the same scale, the power generation exceeds that of crystalline silicon 8.8%.